The McKee Fehl team has undertook multiple residential and commercial construction works at 36 Customhouse Quay on behalf of Cornerstone Partners.

The mixed residential/commercial nature of the building, combined with approximately 80% of the property remaining tenanted during construction, required a highly tailored, phased and carefully coordinated construction approach.

Completed works included:

  • Seismic strengthening across all floors of building including four level carpark
  • Complete replacement of exterior cladding, waterproof membrane, and south façade window glazing on all nine office floors.
  • Replacement of the existing roof while the building was fully occupied.
  • Complete interior and exterior refurbishment of the penthouse apartments.
  • Top spec new tenant office fitouts on Level 9 for Madison Recruitment and Level 11 for The Property Group Ltd. Both included open plan working spaces, breakout meeting and boardrooms.
  • Large format exterior signage along top of buildings east and north façade.

Notable project challenges:

  • With over half the building occupied, the window replacement work required a delicate approach where McKee Fehl worked directly with the tenants to minimise disruption, provide adequate protection of the fitout and shield workers from the weather. 
  • An additional evening crew was employed to conduct all plaster topping removal and concrete drilling to accommodate noise restrictions (especially for internal and adjacent office workers).
  • Custom fire rating solutions were required due to the mixed residential/commercial nature of the building and the presence of a retained timber/steel support structure in the penthouse apartments. McKee Fehl worked closely with the fire engineer, mechanical engineer, architect and mechanical/sprinkler contractor to develop tailor made solutions.
  • A tailored construction plan including traffic management, road closures, and minimum duration system change was implemented to accommodate 16 story crane lift to remove an existing chiller and install a new replacement.

 